 Pipeline and Storage Tank Services  Hydrotest Water Treatment

Storage Tank Hydrotest & Degassing

LNG Tank Hydrotest

Specialists

·         ProAct Services can provide high purity water for LNG Tank Hydrotests.

      Water sources include sea water, estuary water, or groundwater.  ProAct Services can mobilize reverse osmosis skids, sand filters, bag filters, carbon filtration equipment with the capacity to deliver up to 2,000 gallons per minute of high purity water.  We can also efficiently remove the water when the testing is complete and place it in adjacent tanks if required. 

      Parameter                                                 Limitation            

        pH                                                           6 - 8 s.u.

        Electric Conduction Ratio                          Below 500 ms/cm @25 degree’s C

   Chloride Content                                      Below 200 ppm         

   Water Soluble Sulfate (SO42-)                  Below 200 ppm                             

   Iron Content (Fe) targeted                        Below 1.0 ppm            

   Ammonia ion content (NH4+)                   Nearly 0 ppm                          

   Chemical Oxygen Demand (CODMn)      Below 15 ppm                         

      ProAct custom designs the water treatment system for each project with extra capacity to guarantee delivery of up to 26 million gallons of high purity water in less than 15 days.  This extra capacity insures that hydrotest water production and transfer activities are on schedule and do not interfere with the tank construction time table.          

·         ProAct has years of experience treating water at high flow rates of 2000 gpm or higher.

Pr  ProAct has an excellent safety record and is dedicated to placing safety first on projects.

·         ProAct will facilitate mobilization and speed demobilization by renting a staging yard near the project.

·         Equipment and pumps are generally 75% of capacity and transfer rates are 25% over specifications.

 

 

Contact: Peter Horrall 210-862-6467 or horrall@proact-usa.com                  

We do it right, and we do it right NOW!            

Water Treatment
Projects
Rental Equipment
Construction Water
Tank Degassing
LNG Hydrotest Water
Safety & Health
Project Photo Gallery

   [Home]  [About ProAct]  [Contact ProAct]   [Terms & Conditions]

Send mail to skar@proact-usa.com with questions or comments about this web site.
Copyright © 2006 ProAct Services Corporation
Last modified: 03/05/08