| High Volume Pre and Post Hydrotest Water Treatment | |
| Mobile carbon and sand filters were used to filter water over a 3 month period for a natural gas pipeline hydrotest in New Jersey. ProAct provided filtered river water for the hydrotest. After the pipeline passed the hydrotest, the hydrotest water was treated with carbon and aeration before discharging back to the river. All discharge criteria were met and there were no accidents on the project. | |
| Volume: 121,559 barrels/5.1M gallons | |
| Flow Rate: 21 BPM/900 GPM | |
| Discharge Monitored for: Benzene, BTEX, Iron, Oil & Grease, Total Suspended Solids, Dissolved Oxygen and pH | |
![]() |
![]() |
![]() |
![]() |