High Volume Pre and Post Hydrotest Water Treatment
 
Mobile carbon and sand filters were used to filter water over a 3 month period for a natural gas pipeline hydrotest in New Jersey.  ProAct provided filtered river water for the hydrotest.  After the pipeline passed the hydrotest, the hydrotest water was treated with carbon and aeration before discharging back to the river.  All discharge criteria were met and there were no accidents on the project.
 
Volume: 121,559 barrels/5.1M gallons
 
Flow Rate: 21 BPM/900 GPM
 
Discharge Monitored for:  Benzene, BTEX, Iron,  Oil & Grease, Total Suspended Solids, Dissolved Oxygen and pH
Call Peter Horrall at (210)862-6467 or email horrall@proact-usa.com for a custom quote.  Peter has years of field experience working with challenging sites and is uniquely qualified in getting you exactly what you need for your site.

We do it right and we do it right NOW!