| High Flow Crude Oil Pipeline | |
|
Multi-process Water Treatment |
|
| ProAct was
contracted to filter hydrotest water directly from a crude oil pipeline.
The project required weir style frac tanks, sand filtration, bag filtration, equalization tanks and carbon filtration. ProAct technicians were on site 24 hours a day to quickly process the hydrotest water. ProAct continuously monitored the water quality to make sure discharge criteria are met and the treatment process is functioning properly. The water treatment was completed in less than three days. |
|
| Volume: 67,000 barrels/2.8M gallons | |
| Flow Rate: 24 BPM/1,000 GPM | |
| Discharge Monitored for: Oil & Grease,
Benzene, Total Organic Carbon, Chemical Oxygen Demand, Total Suspended Solids and pH |
|
![]() |
![]() |
![]() |
![]() |
| Call
Peter Horrall
at (210)862-6467 or email
horrall@proact-usa.com